Tower Crane Dismantling Method Statement Today

A Tower Crane Dismantling Method Statement is a critical safety document that outlines the step-by-step procedure for removing a crane from a construction site.

Step 3: Dismantle the Jib (Fly Jib or Main Jib)

Using the auxiliary mobile crane.

: Confirm the assisting mobile crane has sufficient capacity and valid certification. 2. Standard Dismantling Sequence Tower Crane Dismantling Procedure | PDF - Scribd tower crane dismantling method statement

  1. Top Section Removal: The top section of the crane will be removed using a mobile crane or a hydraulic crane.
  2. Middle Section Removal: The middle sections of the crane will be removed in a sequential manner, working from top to bottom.
  3. Bottom Section Removal: The bottom section of the crane will be removed last.

5. Permits and notifications

  • Obtain permit to work, lifting permit, hot works permit (if needed), confined space permit (if needed).
  • Notify local authorities/traffic management if road closures or oversized loads are required.
  • Notify personnel, site neighbours and stakeholders of planned activities and exclusion zones.